Case Overview

This project was used in Germany, Cologne – a mid-size football stadium event (about 28,000 spectators).
The requirement was simple: manage entry flow and prevent crowd pressure near gates.The system used our modular crowd control barrier panels with fast interlocking hooks.

Application Solution 1 – Stadium Entry Control

Total barrier length: 140 meters
Setup time: 50 minutes (5 workers)
Panel size: 2.1m × 1.1m
Material: galvanized steel + powder coating
Use:

  • 3 entry queue lines
  • 1 emergency passage
  • 1 staff-only corridor
Application Solution 2 – Flexible Flow Adjustment

Focus keyword repeated: temporary crowd control barrier system for outdoor events installation
The system allowed quick changes during peak time:

  • Queue lines extended by +30 meters
  • One lane removed for VIP access
  • Re-linked without tools
Application Solution 3 – Transport & Storage

Nestable design saves ~60% storage space.
Each panel weight: 18–22 kg.
Pallet packaging for easy logistics.

Result

The installation was stable under normal pedestrian pressure.
No fixed ground system required.
Used again in later match events.